Shanxi Zhongde Dingli Group
Success Stories

Real results from global clients

How mining and construction companies worldwide achieve higher productivity, lower cost, and safer operations with ZD equipment.

50+
Countries Served
1000+
Systems Deployed
99.8%
Reliability Rate
15+
Years On Site
Asia-Pacific2024Mining

Large-scale iron ore mine reduces blasting costs by 65%

The challenge

  • High blasting costs driven by stringent safety regulations
  • Vibration damage to nearby equipment and infrastructure
  • Limited work windows due to environmental restrictions
  • Labor shortage for explosive handling and certification

The solution

  • Deployed 12 CO₂ gas fracturing systems for secondary breaking
  • Customized high-capacity boosters for hard rock conditions
  • Integrated drill-split machines for rapid hole preparation
  • Comprehensive operator training and ongoing technical support
65%
Cost Reduction
3x
Productivity Increase
100%
Safety Compliance
12 mo
ROI Achieved

“The transition to CO₂ fracturing has transformed our secondary breaking operations. We have seen immediate cost reductions and significant improvements in workplace safety.”

— Site Manager, Iron Ore Mining Co.
Southeast Asia2023Tunneling

Hydroelectric tunnel achieves near-zero vibration excavation

The challenge

  • Extremely tight vibration limits due to nearby settlements
  • Confined tunnel space limited equipment options
  • Requirement for continuous operation around the clock
  • Need to maintain tunnel structural integrity during breaking

The solution

  • Compact DL-110 and DL-130 piston splitters deployed
  • Custom-designed low-profile mounting for tunnel constraints
  • High-pressure hydraulic systems for maximum splitting force
  • Dedicated on-site maintenance team for uninterrupted operation
0.05 mm/s
Vibration Peak
1500 T
Split Force
99.9%
Uptime
8 mo
Ahead of Schedule

“The piston splitters exceeded all our expectations for low-vibration excavation. We completed the tunnel ahead of schedule while maintaining strict environmental compliance.”

— Project Engineer, Hydro Tunnel Consortium
Middle East2023Urban Construction

Urban metro foundation completed without disrupting traffic

The challenge

  • Extremely tight urban environment with active traffic above
  • Strict noise and dust regulations for residential areas
  • Limited workspace for traditional heavy equipment
  • 24-hour operation requirement to meet project deadlines

The solution

  • ZD1500 drill-and-split integrated machines deployed
  • Silenced pump stations for noise reduction
  • Dust collection systems for environmental compliance
  • Compact equipment design for constrained urban space
Zero
Traffic Disruptions
45 dB
Max Noise Level
3x
Faster Progress
100%
Compliance

“The drill-and-split machines enabled us to work in extremely sensitive urban conditions without causing any disruption to traffic or residents. The project was completed ahead of schedule.”

— Construction Director, Metro Infrastructure Authority
More infrastructure case studies are being documented — contact us and we will share relevant references directly.
Next Case Is Yours

Ready to achieve similar results?

Our team helps you match the right solution to your geology, budget, and schedule.