Resistance Test
Measure tube resistance with the tester and confirm the value is within the standard range, tolerance ±0.5Ω.
Disposable CO2 Fracturing Tube · Disposable Series
Single-use gas expansion tubes for regulation-free rock fragmentation. Initiation in 4 milliseconds, 9 V low-voltage wiring, no detonation, no misfire, and no blasting license.
Contained chemical reaction, high-pressure gas expansion, and none of the blasting baggage.
No spark, no arc, no flame. Impact, friction, and static electricity cannot trigger detonation. CO2 is inert and actually suppresses combustion.
Only CO2 is released as the primary gas, a flame retardant by nature. No toxic CO, NOx, minimal dust, and low noise.
No explosive permits, no specialized storage, no professional guards. Operating costs drop 30%+ compared with blasting.
Fracturing completes in 4 milliseconds. No misfire, no post-blast inspection, 9 V low-voltage initiation.
Fracturing direction is controllable, delayed initiation is supported, and energy levels adjust to rock hardness.
Not classified as explosives. No blasting license, easy transport and storage, and no special security personnel.
Case footage of the disposable tube cracking rock on site, in vertical 9:16 for mobile-first viewing. The same cut works on Douyin and other short-video channels.
CASE FOOTAGE · DISPOSABLE TUBE
From resistance test to ventilated face.
Measure tube resistance with the tester and confirm the value is within the standard range, tolerance ±0.5Ω.
Connect tubes in series. Use 0.5 mm² copper wire for branches and 1 mm² or larger for the main line. Seal every joint.
Insert the tube with the lead end facing the hole bottom, leaving about 30 cm exposed. Backfill with fine gravel, then coarse.
Personnel evacuate to at least 50 m. The safety officer alarms, charges the initiator to about 2000 V, and fires.
After fracturing, ventilate continuously and enter the work area only after gas detection confirms safety.
Drill and blast alternative. Safe, eco-friendly, no approval needed.
The regulation and safety gap at a glance.
| Parameter | Traditional Explosives | CO2 Fracturing Tube |
|---|---|---|
| Regulation | Explosives, strict control | Not classified as explosives |
| Fire Risk | Open flame, sparks | No flame, no spark |
| Gas Explosion Risk | High risk in gas mines | CO2 inert, zero risk |
| Misfire | Requires professional handling | No misfire possible |
| Flyrock & Shockwave | Significant | Minimal flyrock, low vibration |
| Toxic Gases | CO, NOx, SO2 | Primarily CO2 |
| Permit Required | Blasting license mandatory | No special license |
| Storage | Specialized magazine | Standard warehouse OK |
| Stone Texture | May damage integrity | Preserves stone texture |
PPR tube material, 0.55 mm² pure copper wire, leads extended 15 mm. Resistance tolerance ±0.5Ω.
| Length | Ignition Heads | Resistance (Ω) | Weight |
|---|---|---|---|
| 0.35 m | 2 | 1.7 - 2.2 | 350 g |
| 0.55 m | 2 | 2.2 - 2.7 | 450 g |
| 1.0 m | 4 | 3.8 - 4.2 | 830 g |
| 1.5 m | 7 | 4.4 - 5.7 | 1,300 g |
| 2.0 m | 10 | 9.1 - 9.6 | 1,700 g |
| Length | Ignition Heads | Resistance (Ω) | Weight |
|---|---|---|---|
| 0.35 m | 2 | 1.9 - 2.2 | 380 g |
| 0.55 m | 2 | 2.2 - 2.7 | 670 g |
| 1.0 m | 5 | 5.1 - 5.6 | 1,350 g |
| 1.5 m | 7 | 5.7 - 6.6 | 1,850 g |
| 2.0 m | 10 | 9.1 - 9.6 | 2,630 g |
| Tube Model | Hole Dia. | Hole Spacing | Drilling Depth | Application |
|---|---|---|---|---|
| Φ32 × 350 | 40 mm | 500-700 mm | 700-900 mm | Cut / Trim hole |
| Φ32 × 550 | 40 mm | 500-700 mm | 800-1,000 mm | Cut / Trim hole |
| Φ32 × 1000 | 40 mm | 700-1,000 mm | 1,300-1,500 mm | Cut / Perimeter |
| Φ32 × 1500 | 40 mm | 700-1,000 mm | 1,800-2,200 mm | Perimeter hole |
| Φ32 × 2000 | 40 mm | 700-1,000 mm | 2,500-3,000 mm | Perimeter hole |
| Φ40 × 1000 | 46 mm | 800-1,000 mm | 1,300-1,500 mm | Perimeter hole |
| Φ40 × 1500 | 46 mm | 800-1,000 mm | 1,800-2,200 mm | Perimeter hole |
| Φ40 × 2000 | 46 mm | 1,000-1,200 mm | 2,500-3,000 mm | Perimeter hole |
What makes the tube safe, fast, and simple.
On electrical initiation, the internal compound reacts within 4 milliseconds to generate a large volume of high-pressure gas.
Compatible with standard high-voltage initiators (2000 V+). Simple series or series-parallel wiring, no specialized personnel.
High-strength PPR construction with 0.55 mm² pure copper wire leads, extended 15 mm for reliable connection.
Certified with zero sensitivity to impact, friction, flame, and static electricity. The safest way to break rock without explosives.
A single-use metal-shell tube running the true liquid-CO2 phase-change mechanism — for sites whose rules, permits or clients require it, without any spent-tube recovery.
Not sure which disposable technology fits your permit situation? Send the site rules and rock type — we will recommend the line and size the tube layout.
Mining, tunneling, quarrying, and urban construction.
Coal mines (low-gas), metal mines, and non-metal mines. Protects ore vein texture for higher yield.
Tunnel excavation, subway construction, and water diversion culverts with minimal disturbance to surrounding rock.
Power shaft excavation, solar panel foundations, directional fracturing, and foundation pit digging.
Dimension stone quarrying with zero damage to texture and a higher block recovery rate than blasting.
What buyers ask about single-use CO2 tubes.
A single-use sealed PPR tube containing an internal gas-generating compound and an electric match head. Initiation produces high-pressure CO2 that splits the rock from inside the borehole.
Reusable systems use recoverable steel tubes with hundreds of cycles. Disposable tubes are single-use sealed cartridges with zero recovery equipment, a lower upfront cost, and the simplest logistics.
In most jurisdictions, CO2 fracturing tubes are not classified as explosives, so no blasting license, specialized storage, or security personnel are required. Confirm local rules with our team.
Orders start from 100 pieces per model, with bulk discounts above 1,000 pieces. Contact us for current pricing and lead time.
Yes — the #90 disposable metal tube runs the true liquid-CO2 phase-change mechanism in a single-use metal shell. It is built for sites whose rules or clients require genuine liquid-CO2 classification, but where collecting and returning spent tubes is impractical.
Yes. The primary gas generated is CO2, which is inert and actually suppresses combustion, making it suitable for low-gas coal mines and other sensitive underground environments.
Tell us your rock type, hole pattern, and order volume. We will confirm tube selection and delivery, with a response within 24 hours.
One tap opens WhatsApp with your inquiry pre-filled, or reach us through the contact page.
WhatsApp: +86 198 3400 7866 / Email: allen@dlminingequipment.com