Filling
Fill liquid oxygen into the rock splitting pipes on site. Until this step, the pipes are inert and safe to handle.
Liquid Oxygen Rock Splitting System ยท DL-III
Liquid-oxygen static rock splitting: safe, eco-friendly, efficient, economical. An 800x phase-transition expansion at -183°C, peak vibration 0.97 cm/s at 100 m, and no hazardous chemicals in the supply chain.
A static, low-vibration, high-power way to break hard rock.
On-site filling mode: before liquid oxygen is filled, the pipes pose no explosion hazard. Transport and storage risk drops dramatically.
End products are mainly water vapor, CO2, and a little oxygen. No toxic NOx or sulfides, no heavy dust.
Peak particle velocity is only about 3.04 cm/s even at 3 m, and 0.97 cm/s at 100 m, far below the 2.0 cm/s explosive threshold. Ideal near buildings and sensitive areas.
Adjustable fracturing power gives a high fragmentation rate with an extremely low oversize boulder yield.
Low overall fracturing cost with better large-scale economics than many mechanical and static cracking methods.
Liquid oxygen is easily purchased from local industrial gas suppliers. A well-established global supply network keeps refueling simple.
After liquid oxygen fully vaporizes, only non-explosive waste remains in the blast hole. Potentially explosive material disappears both physically and chemically.
Field footage of liquid oxygen rock splitting, in widescreen 16:9. Pause or resume anytime with the control on the video.
Liquid oxygen at -183°C expands more than 800 times during an instantaneous phase transition.
Fill liquid oxygen into the rock splitting pipes on site. Until this step, the pipes are inert and safe to handle.
Activate the liquid gas with a micro-current, releasing massive heat instantly inside the sealed pipe.
The liquid gas rapidly vaporizes and expands about 800 times in volume, generating high impact pressure.
High-pressure gas ruptures the pressure-set shear disc, acts on the rock face, and strips or breaks rock from the mass.
Five steps from borehole to split rock.
Hole diameter 90-115 mm, spacing 3 m, row spacing 3 m, depth 4-10 m depending on the pipe model.
Set the rock splitting pipes into the boreholes, ready for filling.
Seal the borehole with soil or crushed stone to contain the expansion energy.
Connect the cables and filling pipeline, then fill liquid oxygen on site.
Fire the high-energy pulse initiator to split the rock.
From cryogenic storage to the split face.
Pressure-retaining (self-pressurizing) Dewar. Model ZD-499L, 2,100×850×1,030 mm, maintains working pressure for field filling.
Models D90/2, D90/4, D90/6, D110/2, D110/4, D110/6 plus connectable variants. Drilling diameter 90/110 mm, lengths 2/4/6 m.
High-energy pulse firing-control unit that triggers the pipe safely and controllably.
Leads, filling hose, connectors, and installation tools for safe field operation.
Match the pipe to your hole depth and rock hardness.
| Model | Diameter (mm) | Length (m) | LOX Capacity (kg/m) | Drilling Dia. (mm) | Drilling Depth (m) |
|---|---|---|---|---|---|
| D90/2 | 750 | 2 | 5 - 8 | 90 | 4.5 - 5 |
| D90/4 | 750 | 4 | 5 - 8 | 90 | 6.5 - 7 |
| D90/6 | 750 | 6 | 5 - 8 | 90 | 8.5 - 9 |
| D90/2C | 750 | 2 (connectable) | 5 - 8 | 90 | - |
| D110/2 | 900 | 2 | 5 - 8 | 110 | 4.5 - 5 |
| D110/4 | 900 | 4 | 5 - 8 | 110 | 6.5 - 7 |
| D110/6 | 900 | 6 | 5 - 8 | 110 | 8.5 - 9 |
| D110/2C | 900 | 2 (connectable) | 5 - 8 | 110 | - |
Reference data from the manufacturer test report. Verify against the actual product specification before ordering.
Field monitoring at Yanling Daye Building Materials Mine, Feb 18, 2023. Sampling rate 10,000 SPS, vibration frequency 31.33-33.85 Hz. Explosive reference limit 2.0-2.5 cm/s.
| Monitoring Point | Distance | Peak Vibration Velocity |
|---|---|---|
| Point 1 | 100 m | 0.9682 cm/s |
| Point 2 | 300 m | 0.5244 cm/s |
| Point 3 | 1,000 m | 0.0378 cm/s |
All measured values stay well below the 2.0 cm/s safety threshold: gentle, controllable energy release.
Open-pit mines, quarries, and large earthwork projects.
Hard rock mining in open-pit mines, stone extraction in quarries, and rock strata stripping.
Large-scale earthwork, foundation pit excavation, trench construction, and slope trimming.
Low vibration and noise make it suitable near buildings, roads, and residential areas.
Efficient secondary breaking of boulders and oversized rock on any site.
What buyers ask before switching to liquid oxygen splitting.
Yes. The system uses on-site filling: before liquid oxygen is filled into the pipes, they pose no explosion hazard. Transport and storage risk drops dramatically compared with conventional explosives.
Liquid oxygen is easily purchased from local industrial gas suppliers in most regions, keeping the supply chain simple and low cost.
Field monitoring recorded peak vibration of 0.9682 cm/s at 100 m, 0.5244 cm/s at 300 m, and 0.0378 cm/s at 1,000 m, all well below the 2.0 cm/s explosive threshold.
Choose by drilling diameter and hole depth: D90 for 90 mm holes, D110 for 110 mm holes, with 2, 4, or 6 m lengths and connectable options. Our engineers confirm the configuration for your rock.
Tell us your rock type, hole depth, and output target. We will confirm the pipe models and system configuration, with a response within 24 hours.
One tap opens WhatsApp with your inquiry pre-filled, or reach us through the contact page.
WhatsApp: +86 198 3400 7866 / Email: allen@dlminingequipment.com