Shanxi Zhongde Dingli Group

Liquid Oxygen Rock Splitting System ยท DL-III

Oxygen expands.
Rock splits.

Liquid-oxygen static rock splitting: safe, eco-friendly, efficient, economical. An 800x phase-transition expansion at -183°C, peak vibration 0.97 cm/s at 100 m, and no hazardous chemicals in the supply chain.

CE & ISO Certified 20+ Years Experience Non-Explosive Static Splitting
800x
Volume expansion at instantaneous phase transition
0.97cm/s
Peak vibration at 100 m, below the 2.0 cm/s limit
8models
D90 / D110 pipes, 2 to 6 m, connectable options
90-110mm
Drilling diameter for the splitting pipes

Why liquid oxygen splitting?

A static, low-vibration, high-power way to break hard rock.

DL-III liquid oxygen rock splitting pipe system
DL-III LOX ROCK SPLITTING SYSTEM

Safety First

On-site filling mode: before liquid oxygen is filled, the pipes pose no explosion hazard. Transport and storage risk drops dramatically.

Environmentally Clean

End products are mainly water vapor, CO2, and a little oxygen. No toxic NOx or sulfides, no heavy dust.

Low Vibration, Low Noise

Peak particle velocity is only about 3.04 cm/s even at 3 m, and 0.97 cm/s at 100 m, far below the 2.0 cm/s explosive threshold. Ideal near buildings and sensitive areas.

High Energy Output

Adjustable fracturing power gives a high fragmentation rate with an extremely low oversize boulder yield.

Cost-Effective

Low overall fracturing cost with better large-scale economics than many mechanical and static cracking methods.

Easy Oxygen Supply

Liquid oxygen is easily purchased from local industrial gas suppliers. A well-established global supply network keeps refueling simple.

Zero Residual Hazards

After liquid oxygen fully vaporizes, only non-explosive waste remains in the blast hole. Potentially explosive material disappears both physically and chemically.

Watch it split.

Field footage of liquid oxygen rock splitting, in widescreen 16:9. Pause or resume anytime with the control on the video.

The principle: 800x expansion.

Liquid oxygen at -183°C expands more than 800 times during an instantaneous phase transition.

STEP 01

Filling

Fill liquid oxygen into the rock splitting pipes on site. Until this step, the pipes are inert and safe to handle.

STEP 02

Initiation

Activate the liquid gas with a micro-current, releasing massive heat instantly inside the sealed pipe.

STEP 03

Phase Transition

The liquid gas rapidly vaporizes and expands about 800 times in volume, generating high impact pressure.

STEP 04

Fracturing

High-pressure gas ruptures the pressure-set shear disc, acts on the rock face, and strips or breaks rock from the mass.

Operating procedures.

Five steps from borehole to split rock.

STEP 01

Drill the Holes

Hole diameter 90-115 mm, spacing 3 m, row spacing 3 m, depth 4-10 m depending on the pipe model.

STEP 02

Place the Pipes

Set the rock splitting pipes into the boreholes, ready for filling.

STEP 03

Stem the Hole

Seal the borehole with soil or crushed stone to contain the expansion energy.

STEP 04

Connect & Fill

Connect the cables and filling pipeline, then fill liquid oxygen on site.

STEP 05

Activate & Split

Fire the high-energy pulse initiator to split the rock.

Four parts. One complete system.

From cryogenic storage to the split face.

Cryogenic LOX Storage Tank

Pressure-retaining (self-pressurizing) Dewar. Model ZD-499L, 2,100×850×1,030 mm, maintains working pressure for field filling.

Rock Splitting Pipe

Models D90/2, D90/4, D90/6, D110/2, D110/4, D110/6 plus connectable variants. Drilling diameter 90/110 mm, lengths 2/4/6 m.

Intelligent Initiator

High-energy pulse firing-control unit that triggers the pipe safely and controllably.

Anti-Static Tool Kit

Leads, filling hose, connectors, and installation tools for safe field operation.

Pipe models, configurable by depth.

Match the pipe to your hole depth and rock hardness.

ROCK SPLITTING PIPE SPECIFICATIONS
ModelDiameter (mm)Length (m)LOX Capacity (kg/m)Drilling Dia. (mm)Drilling Depth (m)
D90/275025 - 8904.5 - 5
D90/475045 - 8906.5 - 7
D90/675065 - 8908.5 - 9
D90/2C7502 (connectable)5 - 890-
D110/290025 - 81104.5 - 5
D110/490045 - 81106.5 - 7
D110/690065 - 81108.5 - 9
D110/2C9002 (connectable)5 - 8110-

Reference data from the manufacturer test report. Verify against the actual product specification before ordering.

Vibration Test Report

Field monitoring at Yanling Daye Building Materials Mine, Feb 18, 2023. Sampling rate 10,000 SPS, vibration frequency 31.33-33.85 Hz. Explosive reference limit 2.0-2.5 cm/s.

Monitoring PointDistancePeak Vibration Velocity
Point 1100 m0.9682 cm/s
Point 2300 m0.5244 cm/s
Point 31,000 m0.0378 cm/s

All measured values stay well below the 2.0 cm/s safety threshold: gentle, controllable energy release.

Built for hard-rock excavation.

Open-pit mines, quarries, and large earthwork projects.

01

Mining Operations

Hard rock mining in open-pit mines, stone extraction in quarries, and rock strata stripping.

02

Infrastructure & Geotechnical

Large-scale earthwork, foundation pit excavation, trench construction, and slope trimming.

03

Sensitive & Urban Sites

Low vibration and noise make it suitable near buildings, roads, and residential areas.

04

Secondary Breaking

Efficient secondary breaking of boulders and oversized rock on any site.

CE & ISO
Certified International quality standards
20+
Years Rock breaking expertise
50+
Countries Global export reach
800x
Expansion Instant phase transition of liquid oxygen

Frequently asked questions.

What buyers ask before switching to liquid oxygen splitting.

Is it really safe to store and transport?

Yes. The system uses on-site filling: before liquid oxygen is filled into the pipes, they pose no explosion hazard. Transport and storage risk drops dramatically compared with conventional explosives.

Where do I get liquid oxygen?

Liquid oxygen is easily purchased from local industrial gas suppliers in most regions, keeping the supply chain simple and low cost.

How strong is the vibration?

Field monitoring recorded peak vibration of 0.9682 cm/s at 100 m, 0.5244 cm/s at 300 m, and 0.0378 cm/s at 1,000 m, all well below the 2.0 cm/s explosive threshold.

Which pipe model fits my job?

Choose by drilling diameter and hole depth: D90 for 90 mm holes, D110 for 110 mm holes, with 2, 4, or 6 m lengths and connectable options. Our engineers confirm the configuration for your rock.

Get Started

Ready to split with liquid oxygen?

Tell us your rock type, hole depth, and output target. We will confirm the pipe models and system configuration, with a response within 24 hours.

Free Consultation No Obligations Response Within 24 Hours

Request a quote

One tap opens WhatsApp with your inquiry pre-filled, or reach us through the contact page.

WhatsApp: +86 198 3400 7866 / Email: allen@dlminingequipment.com