Success Stories
Real-World Results from Global Clients
Discover how mining and construction companies worldwide have achieved higher productivity, lower costs, and enhanced safety with our non-blasting rock breaking solutions.
Filter by Industry
Asia-Pacific
2024
Large-Scale Iron Ore Mine Reduces Blasting Costs by 65%
A major iron ore mining operation in Australia successfully implemented CO2 gas fracturing systems to replace traditional explosives, achieving significant cost savings and improved safety standards.
!
The Challenge
- High blasting costs due to stringent safety regulations
- Vibration damage to nearby equipment and infrastructure
- Limited work windows due to environmental restrictions
- Labor shortage for explosive handling and certification
✓
The Solution
- Deployment of 12 CO2 gas fracturing systems for secondary breaking
- Customized high-capacity boosters for hard rock conditions
- Integrated drill-split machines for rapid hole preparation
- Comprehensive operator training and ongoing technical support
Key Results
Product Used
“The transition to CO2 fracturing has transformed our secondary breaking operations. We’ve seen immediate cost reductions and significant improvements in workplace safety.”
— Site Manager, Iron Ore Mining Co.
Southeast Asia
2024
Hydroelectric Tunnel Project Achieves Zero Vibration Excavation
A critical hydroelectric tunnel project in Southeast Asia required ultra-low vibration excavation to protect surrounding structures and environmental assets, leading to the adoption of piston rock splitters.
!
The Challenge
- Extremely tight vibration limits due to nearby settlements
- Confined tunnel space limited equipment options
- Requirement for continuous operation 24/7
- Need to maintain tunnel structural integrity during breaking
✓
The Solution
- Implementation of compact DL-110 and DL-130 piston splitters
- Custom-designed low-profile mounting for tunnel constraints
- High-pressure hydraulic systems for maximum splitting force
- Dedicated on-site maintenance team for uninterrupted operation
Key Results
Product Used
“The piston splitters exceeded all our expectations for low-vibration excavation. We completed the tunnel ahead of schedule while maintaining strict environmental compliance.”
— Project Engineer, Hydro Tunnel Consortium
Middle East
2024
Urban Metro Foundation Completed Without Disrupting Traffic
A metropolitan metro foundation project in the Middle East successfully utilized drill-and-split integrated machines to break rock within meters of major roads and residential buildings, maintaining normal traffic flow throughout.
!
The Challenge
- Extremely tight urban environment with active traffic above
- Strict noise and dust regulations for residential areas
- Limited workspace for traditional heavy equipment
- 24-hour operation requirement to meet project deadlines
✓
The Solution
- Deployment of ZD1500 drill-and-split integrated machines
- Silenced pump stations for noise reduction
- Dust collection systems for environmental compliance
- Compact equipment design for constrained urban space
Key Results
Product Used
“The drill-and-split machines enabled us to work in extremely sensitive urban conditions without causing any disruption to traffic or residents. The project was completed ahead of schedule.”
— Construction Director, Metro Infrastructure Authority